
Solar power for
Coco Grove Siquijor.
A resort hybrid solar installation in San Juan, Siquijor.
Reliable energy for a destination resort.
Coco Grove welcomes guests across resort rooms, dining spaces and shared facilities. The project pairs rooftop solar with battery storage to use more locally generated power during the day and support selected loads when the grid is unavailable.
Designed around the site.
Coco Grove welcomes guests across resort rooms, dining spaces and shared facilities. The project pairs rooftop solar with battery storage to use more locally generated power during the day and support selected loads when the grid is unavailable.
The array is sized to cover a large share of daytime demand, while storage shifts some solar energy into evening operations. The grid remains available as a backup source.
From site work to handover.
Site assessment
Roof structure, shading and resort load profiles were reviewed before final equipment placement.
Mounting and array
The crew installed roof mounts, rails and panel strings across two low-slope service buildings.
Electrical integration
Inverters, battery cabinets and protection devices were wired into the designated resort distribution board.
Testing and handover
The system was inspected, commissioned and handed over with monitoring access and operator orientation.
Indicative project outcomes.
Estimated output and savings are based on the installed system size and typical sunny-site conditions. Actual performance varies with weather, shading, load profile and system operation.
Installation photos.


Have a site with similar energy needs?
Talk with the Repeat Solar team about a system designed around your property.
Estimate your system